In 2026, an ADU in Los Angeles typically costs $180,000 to $400,000+, or about $250 to $400 per square foot. Here is a full cost breakdown by ADU type, including plans and permits.
Get a Free QuoteWhat you pay depends most on the type of ADU and your lot. Here are typical all-in construction ranges for LA County:
| ADU type | Typical size | Estimated build cost | Cost per sq ft |
|---|---|---|---|
| Garage conversion | 400–600 sq ft | $100,000–$225,000 | $150–$250 |
| Junior ADU (JADU) | up to 500 sq ft | $90,000–$180,000 | $180–$300 |
| Attached ADU | 400–1,000 sq ft | $150,000–$350,000 | $250–$375 |
| Detached ADU | 600–1,200 sq ft | $200,000–$400,000+ | $250–$400 |
Ranges reflect 2026 Los Angeles pricing and vary with finishes, site conditions, and city. Westside and hillside lots can exceed $500 per sq ft. Build-cost totals are all-in (design, permits, site work, and construction), so they run higher than size multiplied by the construction-only rate.
An ADU budget is more than construction. The main line items:
These are two different numbers, and mixing them up is the most common budgeting mistake:
Buying a permit-ready plan set first lets you get an accurate construction bid and move through plan-check faster.
Most ADUs in Los Angeles cost $180,000 to $400,000+ to build in 2026, or roughly $250–$400 per square foot. Garage conversions are cheaper at $100,000–$225,000.
A garage conversion is usually the cheapest ADU because it reuses an existing structure, typically $100,000–$225,000, or about $150–$250 per square foot.
A permit-ready plan set typically costs $8,000–$20,000 custom. Jayzar pre-designed ADU plan sets start at $7,900.
No. City permit and agency fees (about $5,000–$25,000) are paid to your city and are separate from construction and plan-set costs.
Browse our permit-ready plan sets or request a free quote and our team will map out the plans, permits, and build with you.
Browse ADU Plans Get a Free Quote